How much does an SM-6 missile cost?

How much does an SM-6 missile cost?

RIM-174 Standard ERAM

RIM-174 ERAM Standard SM-6
Manufacturer Raytheon
Unit cost US$4.87m (US$8,766.6m for 1800) US$4,318,632 (FY2021) (average)
Produced 2009–present
No. built 500 (1,800 planned)

How much does an SM 2 missile cost?

STANDARD MISSILE-2 (SM-2)

Navy ACAT IC Program: Prime Contractor
Total Program Cost (TY$): Blocks I-IIIB: Block IV: $8,487.3M $807.9M
Average Unit Cost (TY$): Blocks I-IIIB: Block IV: $0.659M $2.719M
Full-rate production: Block-IIIB: Block IV: 4QFY96 Did not occur Service Certified Y2K Compliant Yes

What is interceptor missile?

While the PDV interceptor missile can destroy incoming enemy weapon systems in exo-atmospheric region, the Advanced Defence interceptor missile has the capability to kill incoming missiles in endo-atmospheric region.

How fast do nukes travel?

Terminal Phase begins when the detached warhead(s) reenter the Earth’s atmosphere and ends upon impact or detonation. During this phase, which can last for less than a minute, strategic warheads can be traveling at speeds greater than 3,200 kilometers per hour (1,988 miles per hour).

How much will the SM-3 cost?

Gerald R. Ford CVN: VERY rough estimate of $7-7.5 billion. 1st to enter service in 2015, followed by 2019 and 2023. America LHA: $2.4 billion SM-3 Block IIB: $15+ million SM-3 Block IIA: $15 million, SM-3 Block IB: $13 million

How much does a Standard Missile 3 cost?

Standard Missile 3 (SM-3) Block IB – $11,830,000. Funding for these missiles come through the Missile Defense Agency’s (MDA) budget. Standard Missile 3 (SM-3) Block IIA – $36,387,000

What does SM-3 stand for?

The RIM-161 Standard Missile 3 ( SM-3) is a ship-based missile system used by the United States Navy to intercept short- and intermediate-range ballistic missiles as a part of Aegis Ballistic Missile Defense System. Although primarily designed as an anti-ballistic missile, the SM-3 has also been employed in an…

What is the cost of the SM-3 Block IIB?

Gerald R. Ford CVN: VERY rough estimate of $7-7.5 billion. 1st to enter service in 2015, followed by 2019 and 2023. America LHA: $2.4 billion SM-3 Block IIB: $15+ million

Begin typing your search term above and press enter to search. Press ESC to cancel.

Back To Top