What are downtime reports?

What are downtime reports?

Downtime is any period of time when a machine is not in production. The Downtime Report provides a collection of graphical and interactive reporting tools that enable you to view and analyze the machine downtime as it is categorized in your environment. …

How do I track downtime?

The best way to track equipment downtime is with a computerized maintenance management system (CMMS). Although many of these programs use a work order system to track downtime, a CMMS with a dedicated downtime module can result in better analysis and reporting of equipment problems and trends.

How do you calculate production downtime?

Sum up the planned operating time for the given production equipment within the given period. For instance, if you want to calculate downtime losses for the month of May and you were operating for 20 days in May for eight hours per day, multiply 20 by 8 to get 160.

How much downtime is unplanned?

Research shows that unplanned downtime lasts for an average of four hours for companies within the manufacturing industry4. In total, manufacturers can experience as much as 800 hours of downtime annually5. Various factors affect the specific length of your downtime.

What is an example of downtime?

When you have had a busy day and you kick back and relax with a beer, this is an example of downtime. When a website is not operational for an hour because the server is being updated, this hour is an example of downtime. Unscheduled downtime is unplanned downtime due to system or environmental (e.g., power) failures.

What’s another word for downtime?

What is another word for downtime?

break pause
intermission interlude
respite recess
rest lull
halt suspension

What is process downtime?

Process Downtime Level measures the extent to which an operational process is available and running. Process Downtime Level = (TA t / PPT t) x 100. Where: PPT t is the Planned Productive Time that a process should be available in a given time period t.

How do I count days in delay in Excel?

To find the number of days between these two dates, you can enter “=B2-B1” (without the quotes into cell B3). Once you hit enter, Excel will automatically calculate the number of days between the two dates entered. Note that Excel recognizes leap years.

How to design a report with downtime data in report designer?

Note: The Data property comes with the Report Viewer by default and it is a dataset. You can add/edit/remove these dynamic properties in the Report Designer. Next, click on the bind icon next to the Data property, select the SQL Query binding type, enter in the query above and press OK. Now, we need to design the report using the downtime data.

What is downtime data in DreamDream report?

Dream Report automatically creates a Database with associated Tables for data storage. This RDB repository becomes the source of Downtime Data along with any other data repositories that may already exist and be connected to Dream Report for other analysis purposes.

How is downtime data recorded?

Often times, machine downtime is manually recorded on a piece of paper. This method is highly inaccurate and can make it hard to analyze or improve the data collected.

How does machine downtime tracking work?

During the machine downtime tracking, variables will be collected and archived for subsequent reports and dashboards and further analysis. However, downtime conditions can also be entered manually to create a database of events and data to analyze.